Monday, July 21, 2014

Kitchen remodeling

Before: microwave mounted too low, tile floor cracking, broken cabinets circa 1975.
Before: black-hole pantry, refrigerator too big for galley kitchen
During: nasty old insulation, drywall on top of old drywall, tiles and cement backer-board being removed.
During: Dan replaced all the drywall, I ripped up the floor, it is ready for cabinets and new flooring
During: replaced drywall where roof was leaking, look at that nice wallpaper that was hiding under the trim.

Friday, July 11, 2014

VBS

snack time
music
hula hoop champion

Thursday, July 3, 2014